Envío a LUKA en todos los libros que quieras  Ver más

menú

0
  • argentina
  • chile
  • colombia
  • españa
  • méxico
  • perú
  • estados unidos
  • internacional
portada jab`s construction, cost escalation, engineering and management, cpm,cost control, change orders, timing and scheduling, critical path method (cpm), program evaluation r
Formato
Libro Físico
Editorial
Año
2011
N° páginas
688
ISBN13
9781450065337
Categorías

jab`s construction, cost escalation, engineering and management, cpm,cost control, change orders, timing and scheduling, critical path method (cpm), program evaluation r

Joseph Brown (Autor) · textstream · Libro Físico

jab`s construction, cost escalation, engineering and management, cpm,cost control, change orders, timing and scheduling, critical path method (cpm), program evaluation r - joseph brown

Libro Nuevo

$ 53.250

$ 81.930

Ahorras: $ 28.680

35% descuento
  • Estado: Nuevo
  • Quedan 50 unidades
Origen: España (Costos de importación incluídos en el precio)
Se enviará desde nuestra bodega entre el Viernes 19 de Julio y el Viernes 26 de Julio.
Lo recibirás en cualquier lugar de Chile entre 1 y 3 días hábiles luego del envío.

Opiniones del libro

Ver más opiniones de clientes
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)

Preguntas frecuentes sobre el libro

Todos los libros de nuestro catálogo son Originales.

Preguntas y respuestas sobre el libro

¿Tienes una pregunta sobre el libro? Inicia sesión para poder agregar tu propia pregunta.

Opiniones sobre Buscalibre

Ver más opiniones de clientes