Compartir
Navy Ohio Replacement (SSBN[X]) Ballistic Missile Submarine Program: Background and Issues for Congress (en Inglés)
Congressional Research Service (Autor)
·
Createspace Independent Publishing Platform
· Tapa Blanda
Navy Ohio Replacement (SSBN[X]) Ballistic Missile Submarine Program: Background and Issues for Congress (en Inglés) - Congressional Research Service
$ 25.080
$ 50.150
Ahorras: $ 25.070
Elige la lista en la que quieres agregar tu producto o crea una nueva lista
✓ Producto agregado correctamente a la lista de deseos.
Ir a Mis Listas
Origen: Estados Unidos
(Costos de importación incluídos en el precio)
Se enviará desde nuestra bodega entre el
Jueves 11 de Julio y el
Jueves 18 de Julio.
Lo recibirás en cualquier lugar de Chile entre 1 y 3 días hábiles luego del envío.
Reseña del libro "Navy Ohio Replacement (SSBN[X]) Ballistic Missile Submarine Program: Background and Issues for Congress (en Inglés)"
The Navy's proposed FY2015 budget requests $1,219.3 million for continued research and development work on the Ohio replacement program (ORP), a program to design and build a new class of 12 ballistic missile submarines (SSBNs) to replace the Navy's current force of 14 Ohio-class SSBNs. The Ohio replacement program is also known as the SSBN(X) program. The Navy has identified the Ohio replacement program as its top priority program. Under the Navy's FY2012 budget, the first Ohio replacement boat was scheduled to be procured in FY2019, and Ohio replacement boats were to enter service on a schedule that would maintain the Navy's SSBN force at 12 boats. The Navy's FY2013 budget deferred the procurement of the first Ohio replacement boat by two years, to FY2021. As a result of the deferment of the procurement of the lead boat from FY2019 to FY2021, the Navy's SSBN force will drop to 11 or 10 boats for the period FY2029-FY2041. The Navy says the decline to 11 or 10 boats during this period will be acceptable in terms of meeting strategic nuclear deterrent mission requirements because none of the 11 or 10 boats during that period will be encumbered by lengthy maintenance actions. The Navy in June 2014 estimated the procurement cost of the lead ship in the program at $12.4 billion in constant 2014 dollars, including $4.8 billion in detailed design and nonrecurring engineering (DD/NRE) costs for the entire class, and $7.6 billion in construction costs for the ship itself. The Navy in April 2014 estimated the average procurement cost of boats 2 through 12 in the Ohio replacement program at about $5.36 billion each in FY2010 dollars, and is working to reduce that figure to a target of $4.9 billion each in FY2010 dollars. Even with this cost-reduction effort, observers are concerned about the impact the Ohio replacement program will have on the Navy's ability to procure other types of ships at desired rates in the 2020s and early 2030s.
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
- 0% (0)
Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Blanda.
✓ Producto agregado correctamente al carro, Ir a Pagar.